UAE · First hubs in planning
Public EV charging in Abu Dhabi.
A capital spread across islands, suburbs and long highways. Drivers need reliable fast charging in the city and on the roads to Dubai, Al Ain and the Western Region.
The landscape
How charging works in Abu Dhabi.
KEEL status: First hubs in planning.
- Grid and rules. The Department of Energy sets the rules for EV charging in Abu Dhabi, and the local distribution utility handles connections.
- Standards. CCS2 for DC and Type 2 for AC, in line with the UAE.
- Demand. Commuters between Abu Dhabi and Dubai, government and corporate fleets, and long-distance trips to Al Ain and beyond.
Where hubs fit
Where hubs make sense here.
Highway stops
On the Dubai and Al Ain roads, where a long drive needs a certain stop.
Malls and offices
Long stays in the city, ideal for fast and workplace charging.
Hotels and leisure
Destination charging on the islands and the corniche.
Hub formats
Highway, city and destination.
Every site gets the format that fits dwell time and grid capacity.
Intercity corridors, where a long drive needs a fast, certain stop. Ready for megawatt upgrades.
- Bays
- 4–12
- Power
- 180–360+ kW
Malls, forecourts and car parks. For drivers without home charging, and for taxi and ride-hailing fleets.
- Bays
- 6–20
- Power
- 60–240 kW
Hotels, offices and leisure sites, where cars stay an hour or more.
- Bays
- 4–10
- Power
- 22–120 kW
FAQ
Questions we hear in Abu Dhabi.
Who regulates EV charging in Abu Dhabi?
The Abu Dhabi Department of Energy sets the rules, and connections go through the local distribution utility. We coordinate approvals with both.
Do you plan highway charging between Abu Dhabi and Dubai?
Yes. Corridor hubs are part of our plan, built for high power and ready for future upgrades.
Can government and corporate fleets work with KEEL?
Yes. We plan depot charging around fleet schedules and offer public hubs for top-ups.
Have a site in Abu Dhabi?
Send us the location. If it isn't right for a hub, we'll say so.
