Concept render of a KEEL charging hub with canopy and fast chargers
Concept render

Public EV charging · Middle East

Public fast charging,built for the Gulf.

KEEL builds and runs public fast-charging hubs in the UAE, Saudi Arabia, Qatar and Egypt. Proven Shenzhen technology, engineered for 50°C summers and run to one standard: the charger works when you arrive.

240 kWper DC charger
50°Cdesign temperature
CCS2the GCC connector standard
4markets, starting in the UAE

The gap

EVs are arriving faster than places to charge them.

EV sales are rising across the Gulf. Public fast charging isn't keeping up, especially between cities, and too many chargers are slow, broken or hard to find.

01

Reliability first

Several chargers per hub, monitored around the clock. One fault never closes a site.

02

Fast, not slow

60 to 240 kW per charger: a useful charge in the time it takes to drink a coffee.

03

Where people already stop

Malls, forecourts, highway rest stops, hotels and offices. Shade, light and something to do while you wait.

Hub formats

Three hub formats, one network.

Each site gets the format that fits how long drivers stay and how much power the grid can supply.

Highway hub
180–360+kW

Intercity corridors, where a long drive needs a fast, certain stop. Ready for megawatt upgrades.

Bays
4–12
Power
180–360+ kW
City hub
60–240kW

Malls, forecourts and car parks. For drivers without home charging, and for taxi and ride-hailing fleets.

Bays
6–20
Power
60–240 kW
Destination hub
22–120kW

Hotels, offices and leisure sites, where cars stay an hour or more.

Bays
4–10
Power
22–120 kW

How we build

From empty car park to working hub.

One team owns every step, from site study to daily operation.

Find the site

Traffic, dwell time, visibility and access come first.

With the host

Secure the power

Grid capacity and utility approvals, with battery storage where the grid is tight.

With the utility

Choose the hardware

Chargers specified for the site and checked at the factory in Shenzhen.

In Shenzhen

Build and open

Civil works, installation and commissioning with licensed local contractors.

On site

Run it

Remote monitoring, regional spares and field crews keep the chargers working.

Every day

Have land, a car park or a forecourt?

Host a KEEL hub. We study the site, the grid and the traffic, then propose a model that works for both sides.

Technology

China builds the technology. KEEL brings it to the Middle East.

China makes most of the world's chargers and runs the largest public network. We buy export-spec CCS2 equipment direct from Shenzhen manufacturers and check it at the factory before it ships.

  • Direct from the factory. No resellers: lower cost, shorter lead times, newer technology.
  • Rated for Gulf heat. Full output at high temperatures, IP54 or better, sealed against dust.
  • Open standards. CCS2, Type 2 and OCPP, so no one is locked in.

Our technology

KEEL DC fast charger concept with specifications

Where

Four markets, starting in the UAE.

We build where demand and grid capacity line up, then follow the corridors that connect the region.

AEFirst hubs

United Arab Emirates

The region's most mature EV market. Our first hubs are being planned here.

SANext

Saudi Arabia

Long intercity distances and national charging targets make corridors a priority.

QAPlanned

Qatar

A compact, high-income market led by hospitality and destination sites.

EGLater

Egypt

The region's largest population. Early, but strategic for city charging and fleets.

Yasser Ayed

From the founder

“Drivers don't remember the charger that worked. They remember the one that didn't. We're building a network nobody has to think twice about.”
Yasser Ayed · Founder, KEEL

About KEEL

FAQ

Questions we hear.

Where can I charge with KEEL today?

Not yet. Our first hubs are being planned in the UAE and we're signing site partners now. Openings will be announced on the network page.

Which cars can charge at a KEEL hub?

Any EV sold in the GCC. DC chargers use CCS2, the regional standard, and AC chargers use Type 2. CHAdeMO can be added where there's demand.

I own a site. What does hosting cost me?

It depends on the model. KEEL can fund, build and run the hub in return for a lease or revenue share, or co-invest with you. We propose a model after studying the site.

Why Chinese charging hardware?

China builds most of the world's chargers and runs the largest public network. Buying export-spec equipment direct from Shenzhen, and checking it at the factory, gets better technology at a better cost than going through resellers.

How do you deal with the heat?

Every hub is designed for 50°C: chargers rated for full output in high heat, liquid-cooled cables at high power, shade canopies and dust protection.

Do you work with governments and utilities?

Yes. Public charging only works with the grid and the regulators, so we coordinate with utilities on capacity and follow each market's approval process.

Let's build the network together.

Site owners, investors, utilities and technology partners: tell us what you have in mind.