Host a hub

EV charging for fleets and depots.

Electric fleets live or die by uptime. KEEL plans depot charging around your duty cycles and gives drivers fast public hubs for top-ups between shifts.

Why it works

Why charging fits here.

01

Planned around shifts

Charger power and numbers are sized to how many vehicles return when, and how fast they must leave.

02

Smart power

Load management charges the whole fleet within your grid limit, prioritising the next vehicles out.

03

Public backup

KEEL's public hubs give drivers fast top-ups on the road, so a depot fault never stops the day.

The setup

What a typical hub looks like.

Every site is studied first. These are the usual starting points for this kind of site.

Fleets and depots
Hub format
Depot + city hubs
Power per charger
40–240 kW
Bays
By fleet size
Typical stay
20 min–overnight

What you get

For the site owner.

  • Lower cost per km from electricity priced and scheduled for fleet use.
  • Session reports energy and cost per vehicle, ready for your finance team.
  • One accountable partner for depot chargers, public hubs and maintenance.

What we need

From you.

  • Fleet data vehicle models, daily kilometres, shift patterns and return times.
  • Depot access space for chargers and electrical equipment, and the depot's grid details.
  • A rollout plan how many vehicles go electric, and when.

FAQ

Questions site owners ask.

Do fleets need DC fast charging at the depot?

Not always. Vehicles parked overnight often only need AC or lower-power DC; fast chargers are for quick turnarounds.

Can drivers charge at public KEEL hubs?

Yes, once hubs are open. Fleet accounts can be billed centrally, so drivers don't pay out of pocket.

How long does a depot project take?

It depends mainly on the grid connection. We assess it first, so the timeline is clear before you commit.

Have a site like this?

Send us the location. If it isn't right for a hub, we'll say so.