Host a hub

EV fast charging for fuel stations.

Forecourts already sit where drivers stop, on busy roads with space, power and a shop. Adding fast charging keeps those drivers as they switch to electric.

Why it works

Why charging fits here.

01

Right place already

Visibility, road access and 24/7 operation are exactly what a charging hub needs.

02

Shop sales

A 20 to 30-minute charge is long enough for coffee and food, much longer than a fuel stop.

03

Future-proof the site

Corridor stations can be built ready for higher power and heavy vehicles later.

The setup

What a typical hub looks like.

Every site is studied first. These are the usual starting points for this kind of site.

Fuel stations
Hub format
City or highway hub
Power per charger
120–360 kW
Bays
4–8
Typical stay
15–40 min

What you get

For the site owner.

  • A share of a new fuel through a lease or revenue share on every kWh sold.
  • Higher shop spend from drivers who wait longer than a fuel customer.
  • A partner who runs it so your team keeps its focus on fuel and retail.

What we need

From you.

  • Space off the pump lanes two to eight bays where cars can stay without blocking traffic.
  • Grid connection fast charging needs serious power; we check capacity and a new connection early.
  • Safety layout chargers placed outside hazardous zones around fuel dispensers, per local rules.

FAQ

Questions site owners ask.

Is EV charging allowed on a fuel forecourt?

Yes, with chargers placed outside the hazardous zones around pumps and tanks. We design the layout to the local authority's safety rules.

How much power does a forecourt hub need?

Four fast chargers can draw around half a megawatt at peak. Battery storage can help where the grid connection is limited.

Can you work across a station network?

Yes. We prioritise the sites with the best traffic and grid access, then roll out in phases.

Have a site like this?

Send us the location. If it isn't right for a hub, we'll say so.