A charging hub mostly succeeds or fails before a single charger is ordered. Get the site right and good hardware does the rest. Get it wrong and the best chargers in the world sit idle. These are the questions we ask about every site.
1. Is there power, and how much?
Fast charging needs a lot of electricity. Four 120 kW chargers running at once draw close to half a megawatt. So the first question is what the grid can supply at the site: spare capacity on an existing connection, or the cost and time of a new one, often with its own transformer or substation.
Where the grid is limited, there are tools: dynamic load management shares the available power across chargers, and battery storage can store energy slowly and release it quickly at peak times. They help, but they don't replace a decent connection on a busy site.
2. How long do people stay?
Dwell time decides the type of charger. At a highway stop, drivers want to leave in 20 minutes, so high power matters. At a mall, an hour is normal, so mid-power DC works well. At a hotel or office, cars stay for hours, and AC charging can be enough. Matching power to dwell time keeps cost sensible and bays turning over.
3. Can drivers get in and out easily?
- Visible from the road, with clear signage.
- Simple entry and exit, without a barrier queue or a long ramp.
- Open 24/7, or as close to it as possible.
- Bays big enough for SUVs and, ideally, a pull-through bay for vans or cars with trailers.
4. Is there a reason to be there?
A charge takes time. Sites with coffee, food, toilets, shopping or a shaded place to sit make that time pleasant, and the host benefits from the spending. An empty corner of a remote car park is the opposite of what we look for.
5. Who will use it?
Traffic on the road outside, visitors already coming to the site, nearby apartments without home charging, and fleets that operate in the area. The best sites have more than one of these.
6. Can it grow?
EV numbers will keep rising. We prefer sites where we can add bays and power later without starting again: room for more dispensers, ducting laid in advance, and a grid connection that can be upgraded.
No site ticks every box. A strong grid connection can make up for an average location; a great location can justify battery storage. What matters is the overall balance, which is why we study each site before proposing anything.
If you own or manage a site and want an honest view of whether it would work, send us the details.